A senior scheduler on your team, a few days a month.
Monthly updates, narratives, look-aheads, and owner meetings — without carrying a full-time salary. The most common structure for GCs running two to five projects.
Most schedulers do one of these well. RCK does all three — because schedules without controls drift, baselines without analysis can't defend a claim, and project management without either is just optimism.
From contractually required baselines to working schedules your superintendents will actually use. Every schedule comes with documented logic, a basis-of-schedule narrative, and a planner who can explain it to your owner.
Know where the project actually stands — not at month-end, after the surprise has already cost you. RCK sets up the controls system, runs the cadence, and delivers reporting your executives will read.
Time Impact Analyses, fragnets, and what-if modeling prepared to AACE and industry-recognized standards — whether you are pursuing entitlement, defending against a claim, or trying to recover the schedule before it becomes one.
Every engagement is senior-led by the same person from kickoff to closeout. Choose the structure that fits your project, and change it as the project changes.
Monthly updates, narratives, look-aheads, and owner meetings — without carrying a full-time salary. The most common structure for GCs running two to five projects.
On-site or hybrid for the duration of a large or complex job: baseline, controls setup, reporting cadence, and claims-ready documentation throughout.
A baseline, a TIA, a recovery plan, an independent schedule review, or an estimate — priced up front, delivered on a date.
Both. Baselines, updates, and analysis are typically produced remotely with regular site visits and owner meetings in person. Embedded engagements on larger projects can be on site or hybrid. RCK is based in Greater Los Angeles and supports projects nationwide.
Primavera P6 and Microsoft Project for CPM schedules, with Smartsheet, Excel, and Power BI for controls and reporting. If your contract specifies a platform, that is the platform the schedule is built in.
It depends on scope and how complete the documents are. On the first call we will look at your contract's schedule specification and give you a realistic date — and a fixed fee for it.
Yes. RCK prepares Time Impact Analyses and forensic delay analyses for contractors, subcontractors, and owners, and supports counsel and claims consultants through negotiation and mediation.
RCK Consulting is DBE/SBE certified, which supports participation goals on public and agency-funded projects. Ask about current certifications and registrations for your agency.
Send over the contract's schedule specification or a summary of the problem. We'll tell you what it takes and what it costs.